List of Draft and General Permit Notices of Intent (NOIs)
Draft Air Permit Decisions that have been issued by DEQ within the previous seventy-five (75) days are listed below. Draft permit Decisions are open for public comment for at least thirty days from the date the notice is published. Please contact the Air Permits Branch for the specific comment period on any draft permit of interest.
In addition, facilities that have submitted Notices of Intent (NOIs) for coverage under an Air General Permit are also listed. NOIs are not subject to public comment but are listed here as a public service.
AFIN* | Facility |
Draft Permit/ Statement of Basis* |
Approximate Draft Date |
Submission ID | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
16-00002 |
Acme Brick Company—Jonesboro Plant Description: Acme Brick Company—Jonesboro - Renewal |
02/25/2025 | HQ6-6QTA-EMTS1 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
70-00473 |
Anthony Forest Products Company, LLC Description: Anthony Forest Products Company, LLC - incorporate the Emergency Engine (designated as SN-35) and update the IA List to remove the 10,000 gal AST (diesel fuel) A-3 source. |
1681-AOP-R21 1681-AOP-R21-SOB |
01/23/2025 | HQ4-GKX9-R73RD | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
31-00010 |
CertainTeed Gypsum Manufacturing, Inc. Description: CertainTeed Gypsum Manufacturing, Inc. - Title V Renewal |
0598-AOP-R16 0598-AOP-R16-SOB |
03/03/2025 | HQ7-CDQ9-0GQEY | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
73-00089 |
Danfoss Power Solutions II, LLC Description: Danfoss Power Solutions II, LLC - heat treat furnaces (one 0.408 MMBtu/hr and one electric) PH01 & PH04 |
1319-AR-10 1319-AR-10-SOB |
03/04/2025 | HQ8-E346-DC8TM | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
35-01514 |
Energy Security Partners GTL Plant Description: Energy Security Partners, LLC - GTL Plant - to reflect three (3) Gas-to-Liquid (GTL) plants to be constructed in the Energy Transition Park (ETP) |
2409-AOP-R1 2409-AOP-R1-SOB |
01/13/2025 | HQ3-G7TA-265Y2 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
73-01084 |
Fayetteville Express Pipeline LLC - Russell Compressor Station Description: Fayetteville Express Pipeline LLC - Russell Compressor Station - Renewal |
2205-AOP-R6 2205-AOP-R6-SOB |
02/18/2025 | HQ5-5PAM-S7YQJ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
32-00036 |
FutureFuel Chemical Company Description: FutureFuel Chemical Company - remove the Anode material process section CP2-1 through CP2-8 |
1085-AOP-R18 1085-AOP-R18-SOB |
02/26/2025 | HQ8-KNZX-PA600 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07-00212 |
Georgia-Pacific Wood Products LLC - Fordyce, Arkansas OSB Plant Description: Georgia-Pacific Wood Products LLC - Fordyce, Arkansas OSB Plant - Renewal |
1803-AOP-R27 1803-AOP-R27-SOB |
02/24/2025 | HQ8-NHFK-D1E0E | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
28-00256 |
Greenbrier Central, LLC Description: Greenbrier Central, LLC - revise the permit limits for the Surface Coating Operations |
1830-AOP-R15 1830-AOP-R15-SOB |
03/12/2025 | HQ5-AMEE-BDQ4X | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
72-00205 |
Kawneer Company, Inc. Description: Kawneer Company, Inc - replace the existing 3.0 MMBtu/hr natural gas-fired paint room pretreatment Tank#1 Burner (SN-19) with a 2.5 MMBtu/hr natural gas natural gas-fired paint room pretreatment Tank#1 burner (propose to retain SN-19). |
0904-AOP-R15 0904-AOP-R15-SOB |
02/06/2025 | HQ6-2Q96-YDPS7 |